Warning: Constant DB_NAME already defined in /customers/d/b/d/xrig.no/httpd.www/wp-config.php on line 68 Warning: Constant DB_USER already defined in /customers/d/b/d/xrig.no/httpd.www/wp-config.php on line 69 Warning: Constant DB_PASSWORD already defined in /customers/d/b/d/xrig.no/httpd.www/wp-config.php on line 70 Warning: Cannot modify header information - headers already sent by (output started at /customers/d/b/d/xrig.no/httpd.www/wp-config.php:68) in /customers/d/b/d/xrig.no/httpd.www/wp-content/plugins/onecom-vcache/vcaching.php on line 595 Warning: Cannot modify header information - headers already sent by (output started at /customers/d/b/d/xrig.no/httpd.www/wp-config.php:68) in /customers/d/b/d/xrig.no/httpd.www/wp-content/plugins/onecom-vcache/vcaching.php on line 603 Warning: Cannot modify header information - headers already sent by (output started at /customers/d/b/d/xrig.no/httpd.www/wp-config.php:68) in /customers/d/b/d/xrig.no/httpd.www/wp-includes/feed-rss2.php on line 8 Coiled Tubing Equipment Archives - Xrig https://xrig.no/product-category/coiled-tubing-equipment/ Tue, 16 May 2023 11:03:09 +0000 en-US hourly 1 https://wordpress.org/?v=6.5.2 https://usercontent.one/wp/xrig.no/wp-content/uploads/2015/02/cropped-Xrig-3-32x32.png Coiled Tubing Equipment Archives - Xrig https://xrig.no/product-category/coiled-tubing-equipment/ 32 32 140259573 COILED TUBING ADVANCED TOWER https://xrig.no/product/coiled-tubing-advanced-tower/?utm_source=rss&utm_medium=rss&utm_campaign=coiled-tubing-advanced-tower Mon, 15 May 2023 11:16:45 +0000 https://xrig.no/?post_type=product&p=4436 The unit has an overall weight of 85t including the skidding assembly. The operation is limited to hands-on when the coil is entering through the strippers, disconnecting the stabbing winch wire and when connecting the coil end to the tool-string.

The post COILED TUBING ADVANCED TOWER appeared first on Xrig.

]]>
The CTAT (Coiled Tubing Advanced Tower) is designed to provide the following safety and operational improvements;

  • Modular built equipment facilitates the assembly from existing platform cranes
  • Operates on  a Skid System reducing the need to use overhead crane to move between wells, crane is therefore not locked for other operations
  • Tool Handler –Tool is controlled from Horizontal to Vertical position
  • Radio Control –All systems –Hardwire Back-Up
  • Flexibility of 360 Degree rotating for both Tower and Injector
  • Skidding of Frame, plus independent skidding of Injector Table (Higher level of accuracy and control related to coil stabbing)
  • Horizontal tilting and leveling of the injector with 4 hydraulic locators means more accurate stabbing.

 