Opstadveien 11

4331 Ålgård, Norway

mail@xrig.com

Contact us

Mon - Fri: 9:00 - 17:30

Online store always open

Coiled Tubing Advanced Tower

The CTAT (Coiled Tubing Advanced Tower) is designed to provide the following safety and operational improvements;

  • Modular built equipment facilitates the assembly from existing platform cranes
  • Operates on  a Skid System reducing the need to use overhead crane to move between wells, crane is therefore not locked for other operations
  • Tool Handler –Tool is controlled from Horizontal to Vertical position
  • Radio Control –All systems –Hardwire Back-Up
  • Flexibility of 360 Degree rotating for both Tower and Injector
  • Skidding of Frame, plus independent skidding of Injector Table (Higher level of accuracy and control related to coil stabbing)
  • Horizontal tilting and leveling of the injector with 4 hydraulic locators means more accurate stabbing.

This website uses cookies. By continuing to use this site, you accept our use of cookies.